Quality is controlled from fabrication requirements to final documentation.
Drawings and codes, materials, fit-up and welding, project-specific NDE, pressure/leak testing and final submittals are managed to project requirements.
Four stages cover the essentials.
Drawings and codes, materials, fit-up and welding, project-specific NDE, pressure/leak testing and final submittals are managed to project requirements.
Drawing & specification
Applicable code, ITP, inspection and document requirements are aligned before fabrication.
Material & fit-up
MTC, material, thickness, dimensions, gap, misalignment and level are checked.
Welding & testing
Welding and surface condition are checked against WPS, with NDE and pressure/leak testing applied per project.
Final inspection & MDR
Final dimensions, surface and accessories are verified and required MTC, Weld Map and test documentation are compiled.
Review the key certifications used for supplier qualification.
The latest source certificate is verified for formal bids and supplier registration.

ASME Certificate of Authorization · U
Manufacture of pressure vessels at the listed location and controlled field sites (ASME Boiler & Pressure Vessel Code)

ISO 9001:2015
Development and manufacture of pressure vessels and semiconductor frames

ISO 45001:2018
Manufacture of pressure and storage tanks

MAIN-BIZ
Management-innovation SME confirmation

INNO-BIZ · A
Technology-innovation SME confirmation
Inspection scope is finalized per project.
Manufacturer, model, quantity and calibration status of measuring equipment are provided in the supplier-qualification package after internal verification.
NDE, pressure testing, FAT and third-party inspection are defined by the applicable code and ITP. In-house and partner scope is clarified per project.